Footwear manufacturing transformation.

Leather footwear, sports footwear and large brownfield footwear organisations — direct, hands-on engagement across every environment, from Design & Development through mass production.

Kaizen training session with a range of footwear samples on display
Process Engineering

It starts at Design & Development, not on the line.

A well-engineered footwear product creates mileage in manufacturing — simpler to build, easier to control, more consistent and more commercially viable.

D&D→Design for Manufacturing→Component Standardisation→Tooling→Process Definition→Risk Assessment→Production Trial→Line Industrialisation→Mass Production
01

Design for Manufacturing (DFM)

Review construction early to simplify operations and ensure repeatability at production scale.

02

Shape & Construction

Evaluate shoe shape and construction so the design is practical and stable for manufacturing.

03

Component & Material Standardisation

Standardise components, materials and specifications to reduce complexity and inventory.

04

Interlocking of Components

Assess how upper, sole and other components interact and fit together to reduce assembly variability.

05

Tooling & Manufacturing Readiness

Consider tooling accuracy, repeatability, maintenance and production capability during development.

06

Process Definition & Risk Assessment

Define sequence and identify potential process failure points before mass production.

07

Production Trials / Pilot Runs

Validate materials, tooling, methods, quality standards and process capability before full-scale production.

08

Quality Built into the Process

Define critical quality points and controls so quality is engineered into the process, not inspected in afterward.

Production-Line Optimisation

An Industrial-Engineering-driven operating logic.

The business is managed through minutes, not only pairs produced — SMV/SAM (Standard Minute Value / Standard Allowed Minute) becomes the common language for capacity, manpower, line loading and productivity.

Demand→Minutes→SMV/SAM→Line Balance→Manpower→Flow & Quality→Output

Low WIP as Standard

Controlled flow with minimum inventory; bottlenecks become visible.

Single-Piece Movement

Move toward single-piece flow to shorten lead time and surface problems fast.

Right People, Right Process

Skill matrices and workload balancing aligned to actual minute demand.

Real-Time Data Discipline

Accurate capture of output, downtime, quality and efficiency for fact-based decisions.

Recent Footwear Projects

Three personally led footwear transformations.

Over the last two years, Mike has personally led and supported three consecutive footwear transformation projects in India as an independent consultant and, most recently, under Texora10XGlobal — covering leather footwear, sports footwear and a large brownfield transformation.

Texora10XGlobal Engagement

GEOX Italia

Leather Footwear · Stuck-on Process9 months
Process Optimisation · QMS · OTD Improvement

An export-oriented leather footwear manufacturing operation using stuck-on construction. Focused on process gaps, process discipline, quality controls and Order-to-Delivery improvement.

70% — current programme progress
Texora10XGlobal Engagement

PUMA India / GSB Footwear

Sports Footwear12 months, ongoing
Change Management · Lean · QMS · Manufacturing Excellence

A transformation programme supporting a sports footwear vertical — Lean practices, quality management, process discipline, workforce engagement and change management, while maintaining production continuity.

75% — current programme progress
Texora10XGlobal Engagement

Liberty Shoes Ltd.

Brownfield Transformation · ~75-Year Legacy OrganisationOngoing
PMS · QMS · Process Optimisation · Change Management

A broad brownfield transformation involving performance-management restructuring, QMS strengthening, process optimisation and change management within an established footwear organisation.

55% — current programme progress

Progress figures are the current, self-reported programme status shared for these engagements. Final scope, baseline, target and measurement method are agreed with each client at programme mobilisation — they are not independently audited results.

Ready to discuss your footwear factory?

Book a confidential 30-minute manufacturing diagnostic — no obligation.

Book a Manufacturing Diagnostic